|     |     |   | 
| Locomotives - Operational Locos - Locos under overhaul - Locos on static display - Locos formerly based on the Bluebell Loco Roster - Loco Stock List - Loco Works News - Join the Loco Dept       The Villa Team at the Bluebell RailwayPictures of the Repair of No 473 Birch Grove, 1983-1986 and 1994-1998
 
New side stays, June 1997.
579x387
 
A new side stay, June 1997.
579x387
 
Firebox under repair, June 1997.
579x387
 
Firebox under repair, June 1997.
579x387
 
New tubeplate fitted, June 1997.
1158x774
 
Firehole ring re-rivetted, June 1997.
1206x792
 
Repaired backhead stay holes, June 1997.
1200x792
 
Backhead stay holes, June 1997.
1174x780
 
Side stay being screwed in, June 1997.
1150x766
 
Tapping and fitting side stays, August 1997.
431x277
 
Fitting side stays, August 1997.
431x287
 
Fitting side stays, August 1997.
431x287
 
Side stays screwed into backhead, August 1997.
424x284
 
Inside firebox with some side stays screwed in, August 1997.
434x290
 
Side stays being screwed in, August 1997.
434x290
 
Repair to side tank, August 1997.
434x290
 
Side stay before knobbling over, September 1997.
358x350
 
Stay knobbling over: spreading out with round tool, September 1997.
402x293
 
Stay knobbling over: spreading out with round tool, September 1997.
Two MPEG video clips:
17 seconds 2.8Mb (sound missing)
33 seconds 5.6Mb (with sound)
 
Stay knobbling over: spread out, September 1997.
266x250
 
Stay knobbling over: spread out, September 1997.
332x308
 
Stay knobbling over: rounding over with flat tool, September 1997.
343x293
 
Stay knobbling over: rounding over with flat tool, September 1997.
303x293
 
Stay knobbling over: rounding over with flat tool, September 1997.
443x287
 
Stay knobbling over: rounding over with flat tool, September 1997.
Six MPEG video clips:
29 seconds 4.9Mb
28 seconds 4.8Mb
24 seconds 4.0Mb
25 seconds 4.2Mb
22 seconds 3.7Mb
24 seconds 4.1Mb
 
Stay knobbling over: rounded over, September 1997.
490x458
 
Stay knobbling over: tucking in edges with chisel tool, September 1997.
365x243
 
Stay knobbling over: tucking in edges with chisel tool, September 1997.
383x295
 
Stay knobbling over: tucking in edges with chisel tool, September 1997.
36 seconds 6.1Mb MPEG video clip
 
Stay knobbling over: tucked in edges, September 1997.
490x458
 
Stay knobbling, September 1997.
434x287
 
Boiler under repair, September 1997.
575x383
 
Foundation ring corner, September 1997.
414x275
 
Firebox outer wrapper crown, September 1997.
414x275
 
Crown stay outer hole before repair, September 1997.
524x474
 
Inner firebox with stays to be knobbled over, September 1997.
420x273
 
Front tubeplate, September 1997.
414x248
 
Right cylinder, October 1997.
422x281
 
Left cylinder, October 1997.
422x281
 
Westinghouse pump, October 1997.
422x284
 
Westinghouse pump, October 1997.
422x284
 
Westinghouse pump details, October 1997.
420x278
 
Frame corrosion, October 1997.
420x278
 
Frame corrosion repairs, October 1997.
420x278
 
Frame crack repair, October 1997.
417x278
 
Inner ends of stays knobbled over, October 1997.
417x278
 
New platework in bunker, October 1997.
422x278
 
New ashpan under construction, October 1997.
422x278
 
New smokebox under construction, October 1997.
422x278
 
Outer crown stay holes built up, October 1997.
422x278
 
Outer crown stay holes and washout plug pads under repair, October 1997.
422x278
 
Corrosion in firebox outer wrapper plate, October 1997.
422x278
 
Boiler under repair, October 1997.
422x278
 
New smokebox saddle and blastpipe, October 1997.
422x278
 
Patches over live steam manifold, October 1997.
417x278
 
New blastpipe, October 1997.
420x281
 
Westinghouse pump, October 1997.
419x281
 
Westinghouse pump maker's plate, October 1997.
420x281
 
Inside firebox above crown, November 1997.
587x391
 
Boiler under repair, November 1997.
422x281
 
Crown stay nuts, November 1997.
422x281
 
Front tubeplate items, November 1997.
419x278
 
Inside dome, November 1997.
422x284
 
Crack in chimney, November 1997.
422x284
 
Brake cylinder and triple valve, November 1997.
422x284
 
Extension main air reservoir, November 1997.
422x284
 
Steam take-off pad, December 1997.
575x387
 
Knobbled-over crown stay, December 1997.
579x391
 
Old crown washout-plug pad, December 1997.
579x391
 
Knobbled-over crown stays, December 1997.
414x275
 
Knobbled-over tubeplate stays, December 1997.
416x278
 
New steam take-offs on firebox top, December 1997.
416x278
 
Foundation ring corner, December 1997.
410x275
 
Remetalled and machined eccentric strap, December 1997.
410x275
 
Safety valves columns base being machined, December 1997.
410x275
 
Regulator gland casting built up by brazing, December 1997.
410x275
 
Freshly-painted wheel and cab side, December 1997.
410x275
     Return to BRPS Home Page, to the Timetable or to Special Events 
Current Loco Works News - Recent Archive News - 1997-2003 Archive News - Villa Team Pictures
 Visitor Info. - Museum - Trust - Catering - Contacts - What's New - Projects - Locos - Carriages & Wagons - Signals - History - Other - Links - Search - FAQ Why not become a BRPS Member? - Get more involved as a Volunteer  Last updated 1 December 1999 by Lewis Nodes and relocated by Richard Salmon, 22 January 2023 © Copyright BRPS. Privacy Policy |