|
Locomotives - Operational Locos - Locos under overhaul - Locos on static display - Locos formerly based on the Bluebell Loco Roster - Loco Stock List - Loco Works News - Join the Loco Dept
Work is currently concentrated on the boiler.
The front tubeplate and its angle ring have been removed for replacement.
A view inside the boiler barrel with the crown stays removed.
The front tubeplate angle iron showing the corrosion which necessitates its replacement.
The old front tubeplate, after the flange has been cut off.
The chalk line surrounds the area where the longitudinal stays are fixed.
The two bright objects in tube holes are guides for centering the new holes when drilling through.
The new front tubeplate, with the old flange welded on;
as this flange is not part of the pressure vessel the old one is sufficiently good to re-use.
On the right is a doubling plate for the longitudinal stay area which will be welded onto the water
side;
the stays will be fixed by a nut and copper washer each side of the plate.
Inside the firebox at the bottom back corner,
showing patch screw installation in progress where the rivet heads have burnt away.
Return to BRPS Home Page, to the Timetable or to Special Events
Current Loco Works News - Recent Archive News - 1997-2003 Archive News - Villa Team Pictures
Visitor Info. - Museum - Trust - Catering - Contacts - What's New - Projects - Locos - Carriages & Wagons - Signals - History - Other - Links - Search - FAQ Why not become a BRPS Member? - Get more involved as a Volunteer Last updated 9 March 1999 by Lewis Nodes and relocated by Richard Salmon, 28 June 2022 © Copyright BRPS. Privacy Policy |