Tickets on sale Vistor Info What's New Shop Search the site FAQ Links Details for the enthusiast How you can join in or help us Contacts Navigate
Bluebell Railway Preservation Society web site Bluebell Railway web site
Donate to the Make Bluebell bloom again appeal

latest Current Infrastucture News
Archive of Infrastucture News: 2013-14 - 2015-16 - 2017 - 2018 - 2019 - 2020 - 2021-22 - 2023
Archive Reports: Northern Extension Project - Permanent Way and Lineside News (2007-2011) - P-Way News (2002-4)
The Queen's Award for Voluntary Service Email Newsletter

 

The Bluebell Railway's Extension

Photos from the Extension, courtesy Nigel Longdon, Chris Dadson and Martin Oakley.

Photos - August 2006

Thumbnail

 
North end of viaduct.
Full size (1152x864), Small (450x338)
Thumbnail

 
O1 loco takes works train Northwards
Full size (800x600), Small (450x338)

Photo - 1 June 2006

Thumbnail

 
Progress on the viaduct.
Standard Definition, Small (450x338)

Photos - 18 January 2006

Thumbnail

 
Graffiti on the viaduct.
High Definition (1440x1080), Standard Definition (800x600), Small (400x300)
Thumbnail

 
Graffiti being removed from the viaduct.
High Definition (1440x1080), Standard Definition (800x600), Small (400x300)
Thumbnail

 
Graffiti-free viaduct.
High Definition (1440x1080), Standard Definition (800x600), Small (400x300)

Photos - 27 November 2005

Thumbnail

 
Repairs to the bridge parapet immediately south of the viaduct.
Standard Definition (800x600), Small (400x300)
Thumbnail

 
The walls within the viaduct, before repair and re-pointing.
Standard Definition (800x600), Small (400x300)
Thumbnail

 
Bricks cut out and replaced in viaduct wall.
Standard Definition (800x600), Small (400x300)
Thumbnail

 
Re-pointed section of viaduct wall.
Standard Definition (800x600), Small (400x300)

Photos - September 2005

Thumbnail

 
New gates at end of viaduct.
Standard Definition (800x600), Small (400x300)
Thumbnail

 
East wall above cattle creep prepared for replacement of coping stones.
Standard Definition (800x600), Small (400x300)
Thumbnail

 
State of the excavation south of Imberhorne Lane Bridge.
Standard Definition (800x600), Small (400x300)

Photos - 6 June 2005

Thumbnail

 
Digging out the first section of tip, south of Imberhorne Lane Bridge.
Standard Definition (768x576), Small (400x300)
Thumbnail

 
First spoil is loaded into Grampus Wagons
Standard Definition (768x576), Small (400x300)
Thumbnail

 
First spoil train leaves Imberhorne Lane cutting for Horsted Keynes, behind Ivatt tank No.41213.
Standard Definition (768x576), Small (400x300)

Main Extension Progress Page - Previous pictures

splash The Queen's Award for Voluntary Service
Return to BRPS Home Page, to the Timetable or to Special Events
latest Current Infrastucture News
Archive of Infrastucture News: 2013-14 - 2015-16 - 2017 - 2018 - 2019 - 2020 - 2021-22 - 2023
Archive Reports: Northern Extension Project - Permanent Way and Lineside News (2007-2011) - P-Way News (2002-4)

Visitor Info. - Museum - Trust - Catering - Contacts - What's New - Projects - Locos - Carriages & Wagons - Signals - History - Other - Links - Search - FAQ
Why not become a BRPS Member?     -     Get more involved as a Volunteer

Your ideal Film/TV location?


Valid HTML 4.0 Transitional! Page maintaned by Richard Salmon with thanks to Nigel Longdon.
© Copyright BRPS.             Privacy Policy